CHAPTER ONE

1.0 INTRODUCTION

1.01 (Background of the study)

According to Luke chapter 14 verses 28-30 which says for which of you intending to build a tower siteth not down first and counteth the cost whether he have sufficient to finish it? Lest haply, after he hath laid the foundation, and is not able to finish it, all that behold it began to mock him.

The above quotation from the Bible summarizes the problem of abandoned project after committing huge financial resources on them are getting out of hand in Nigeria. It is obvious that poor budgetary planning and cost control is responsible for failure of those project as most failures could be traced to poor funding in the project.

According to Iwu Anthonia (2006) Sited that cost control should be exercised at the execution phase as the budget is the financial compass for comparing projected and actual cost of the project in budgeting knowledge of why cost may change from one period to the next is very essential. Cost control should not be achieved without good understanding of source of cost variance. It is expected that within the budgeted project cost, the project be designed to provide at least good value for client’s money in terms of profitability. Efficient cost control measures will ensure that the project team controls the circumstances surrounding the project procurement instead of the circumstances controlling them.

1.02 STATEMENT OF THE PROBLEMS

According to ANDAWEI M. (2007) said that construction project’s success especially in Nigeria is mostly circumscribed by time and cost overrun, sub standard work, poor or ineffective pre-contract and post contract planning cost which eventually could lead to project failure. This phenomena pose a big threat to the construction industry. It is factual that, most project are abandoned or failed on the account of especially poor budgeting and cost control, which eventually leads to time and cost control, which eventually leads to time and cost overrun from the outset of the construction project. Consequently, these have marked negative effect both on the economy and the public at large as the construction industry supplies the basic need for shelter, roads and hospitals etc. arising from the inability of the construction clients at both private and public sectors to proceed with the project.

According to KERZNER H (1987) Sited that construction project success is largely attributed to adequate budgeting and cost control techniques in the design and construction process of a construction project. Therefore, to curb these inherent problems proper investigation on the effect of budgetary and cost control on construction projects is highly inevitable.

1.03 SIGNIFICANCE OF THE STUDY

There is need to operate an efficient and effective budgetary control before any contract is carried out efficient cost, cost control process during the design stage of a project is important in other to ensure that the total cost of a building is within the clients cost limit.(JOHN ALUFOHAI 2002).

RAYMOND KOTEY 1989 sited that budgetary planning and contract auditing are tools, which have great potentials in the fight against corruption in a situation where the budget exceeds the clients cost limit the design has to be modified mostly the finishing’s. These modifications should aim at given him a building that is soundly constructed with good aesthetics and well suited to perform the function for which it is required.

To keep the final account figure within the employer’s budget, it is mostly based on approximate estimated cost prepared by the quantity surveyor in the early stages of the project of the design process.

Having known this, it is obvious that effective cost planning and cost control should be applied through out all stages of design and execution of the project.

1.04 AIMS AND OBJECTIVES

The paramount aim of this study is to determine the effects of budgetary and cost control measures on the building or construction projects.

This aim could be realized through the following objective.

1. To identify the various cost control measures or techniques mostly employed in the construction projects.

2. To examine the significance of these techniques on construction project success.

3. To determine the flexibility level. Of budgeting and cost control measures in the construction projects.

4. The determine the reasons these approaches or measures is inevitable for adoption in the successful completion of a construction project.

1.05 SCOPE AND LIMITATION OF THE STUDY

The overall scope of this study is restricted to construction projects executed or under construction projects that are considered in this content are selected:-

⦁ Tertiary Institution Buildings

⦁ Educational Buildings

⦁ Office Complex Buildings

In the course of carrying out this research work, I have been faced with some limitations of time, finances and lack of relevance materials for this research. I was unable to reach some vital places and people that could have offered immense contribution or information relating to this study.

Also, following the bureaucratic nature of some on going construction project site, which I was able to visit, most of their staff personels were afraid to provide accurate information inquired of them.

Sequel to the above constraints, the extent to which data could have been collected was affected and consequently the scope of the research.

1.06 RESEARCH QUESTION

Sequel to the objectives of this study, answers shall be proffered to the following research questions, formulated and carefully handled to enable these research objectives to be achieved.

1. What are the possible budgeting and cost control measures or techniques mostly employed by the quantity surveyor in the construction project?

2. What is the significance of cost control and budgeting in the construction project?

3. What are the factors that affect the budgeting and cost control in the construction projects?

4. What is the level of application of  budgeting and cost control techniques or approaches in the construction projects.

1.07 DEFINITION OF TERMS

BUDGET:- The forecast and monitoring of  both anticipated income and expenditure of an organization globally.

BUDGETING:- The process of financial control where actual expenditure for a period is compared with appropriate budget allowance for each unit.

COST:- Cost in respect of building work implies amount paid by client for either completed building or for specific section of building.

COST LIMIT:- Maximum expenditure the clients are prepared  to make in relation to completed building.

COST CONTROL:- All method of  controlling cost of  building projects within the limits of predetermined sum throughout the design and construction stages.

PLAN:- A purpose or intending course of  action.

COST PLAN:- A statement of the proposed expenditure on each section or element of a new building related to a definite standard of quality.

COSTCHECK:-The process of checking the estimated cost of each section or element of the building as detailed designs are developed against the cost target set against it in the cost plain.

COST ANALYSIS:- The systematic breakdown of a cost data often on the basis of element to assist estimating the cost and in the cost planning of  future project.

COST MODELING:-This is a symbolic representation of a system expressing the contents of that system in terms of  the factors, which influence its costs.

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:






HOW TO GET THE COMPLETE PROJECT MATERIAL ON AN EVALUATION OF BUDGETING AND COST CONTROL OF A BUILDING CONSTRUCTION INDUSTRY

  • * Click the green DOWNLOAD button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."


  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."


  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."


  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."


  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."


  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."


  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."


  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"


  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"


  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."


  • Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"


  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."


  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project on AN EVALUATION OF BUDGETING AND COST CONTROL OF A BUILDING CONSTRUCTION INDUSTRY

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for AN EVALUATION OF BUDGETING AND COST CONTROL OF A BUILDING CONSTRUCTION INDUSTRY, What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on AN EVALUATION OF BUDGETING AND COST CONTROL OF A BUILDING CONSTRUCTION INDUSTRY?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.