ABSTRACT

The proposal is based on the impact of materials management in organization productivity. these project need to be studied in order to bring about awareness at least on the side of the research user and to adopt to the laws given by the manager or management to the workers. Material management can be defined as a science based art which deals with the planning, organization, controlling and directing of the supply and processing actives of materials in an organization. The chapter one of this research work will be basically on the introduction of the case study, statement of the problem, objective of the study, significance of the study, scope and limitations of the study and defined of the terms. The chapter two shall look at the literature review, historical background of the study, source of raw materials, factors affecting the size of raw materials field in store, the male or buying decision, cost associated with raw materials, the inventory management system and the function include in material management. Chapter three of the project shall be looking on the research methodology and review of the case study, research design, population size, research methodology used and method of data collection and analysis. Chapter four of the project will focus on the data analysis through single method and testing of hypothesis. Finally, the chapter five of the project will look into the summary of the findings, conclusion and recommendation of the data. 

TABLE OF CONTENT 

Title page  i

Certification  ii

Dedication  iii

Acknowledgement iv

Abstract  v

Table of content    vi

CHAPTER ONE 

1.1 General introduction  1

1.2 Statement of the problem 2

1.3 Objective of the study  2

1.4 Significance of the study  3

1.5 Scope and limitation of the study  4

1.6 Definition of the terms  4

CHAPTER TWO; LITERATURE REVIEW  9

2.1 Historical background of the case study  10

2.2 Source of raw materials  12

2.3 Factors affecting the size of raw materials held in store  13

2.4 The make or buying decision  16

2.5 Cost associated with raw materials  17

2.6 The inventory management system  18

2.7 Function included in material management  23

CHAPTER THREE 

3.1 Research methodology and overview of case study  25

3.2 Research Design  25

3.3 Population Size  26

3.4 Research methodology Used  26

3.5 Method of data collection and analysis  27

CHAPTER FOUR 

1.1 Data analysis through single method 30 

CHAPTER FIVE 

5.1 Summary of the findings  39

5.2 Conclusions  40

5.3 Recommendations 41

Reference 44

Appendix45

CHAPTER ONE

1.1 GENERAL INTRODUCTION 

Material management in an organization is all embracing than any other form of management because of the diverse activities involved such as:  

1. Purchasing 

2. Stores 

3. Inventory control 

4. Production control 

5. Quality control 

6. Packaging 

7. Warehousing 

8. Inward and out ward inspection 

9. Marketing or sales.

Therefore, material management is the act of planning, organizing, controlling and directing of the supply and processing activities of material in an organization.

The impact of material management on organization productivity is unavoidable either positively or negatively, this. In production, material must be managed properly on order to avoid any the seventy five parent (759) of the entire operation and the money spent on material alone range between 60-65% of the company total arrestment. Therefore, the importance of material in an organization is very obvious and should be given proper attention.

1.2 STATEMENT OF THE PROBLEM   

For the purpose of this research work, there are lots of limitation of problem of that lingered the project to be carried all effectively.

Therefore, because we were approaching the end of the National Diploma (ND) there is time constraint and there was not enough time to carry out the project work as necessary.

Also, the research of this project is limited to coca-cola plant at Ilorin; although the company has various plants all over the countries and even the work at large. Therefore, the information supplied in this project milled to business strictly to the economic environment.

1.3 OBJECTIVE OF THE STUDY

These are the objective of the study that shows the impact of material management on organization productivity. It shows how a manufacturing organization can survive through the effective management of materials. Among the crucial objective of the study are:

2. To examine how raw materials can be made available directly or indirectly form abroad or within the country.

3. To look at ways and sub- strategies that can be adopted in order to develop alternative means of getting raw materials so as to guarantee availability when it is needed.

4. To identify the role of material control in effective management of raw materials such that material can be procured and stored at an economic quality that guarantee a fair price and right quality.

5.  To take note adequately of the role of machine utilization in the management of raw materials an order to reduce scrap rate.

1.4 SIGNIFICANCE O THE STUDY   

The study lies on how alternative means of getting raw materials can be embarked upon to make possible its availability when need and also to find the solution to the problem of absolve dependence on foreign sources.

The storage of raw materials and economically producers can plan adequately against higher than maximum stock lever and lower than minimum stock level which can bring about some negative implosion on the business capital.

The study also arm at suggesting and deciding strategies.

That can be used and the serried of the manufacturing industry through efficient materials which will lead to economic boost.

1.5 SCOPE AND LIMITATIONS OF THE STUDY 

The project will focus on the relevant aspect of materials management in production and it limitation to its relationship with the current situation of our economy. It will cover areas like sources availability and utilization of raw materials. 

 In the course of study, the research is limited to Nigeria bottling company Ilorin and in searching for the collection of data, only workers  in department that have relationship with the project topic will be adequately unrolled such as production department, store department, purchasing department quality control and the account or administer department.

1.6 DEFINITION OF THE TERMS   

1. MANAGEMENT

Management can be defined as a process of planning contorting, directing, motivating organizing and budgeting in order to active a particular goal.

Management can also be defined as the process entailing Responsibility for effective and economic planning and regularizing responsibility of the operation of an enterprise in fulfillment of a given purpose or task. 

2. RAW MATERIAL 

Raw material can be defined as a good that has not been committed to production on a manufacturing firm.  Raw material can also be defined as the inputs of an organization production process aimed at conversion from raw materials stage to finished goods. 

3. AN ORGANIZATION 

Organizations are group of people with ideas and researches to achieve organization goal. 

Broadly, an organization can be defined as a process of identifying and grouping the work to be performed, defined and developing  responsibility and authority and establishing relationship for the purpose of enabling to work together an accomplishing the objectives of an organization effectively. 

4. PRODUCTIVITY 

Productivity can be defined as the amount of output per unit of input (labour, equipment and capital); there are many ways of measuring productivity. For example, productivity in a factory might be measured based on the number of hours. It takes to produce good while in service sector, productivity might be measured based on the avenue generated by an employed decided by his/ her salary.   

5. PRODUCTION 

Production can be defined as the creation of utility. Also production can be defined as the process of manufacturing or transforming raw materials into finished goods for the use of consumers.  

6. PURCHASING  

Purchasing can be defined as the process of buying goods and services of the right quality in the right quantity at the right price and the right time from the right supplier or source to be delivered at where and when needed. 

7. PRICE 

Price may be seen as the point at which exchange takes place- the point at which the amount for which the seller is writing to sell his product or service coincides with the amount that the buyer is willing to pay for the benefits offered by the product or service.  

8. INSPECTION  

Inspection is the process of ascertaining whether or not the goods delivered are of the specified quality.

9. STOCK CONTROL 

Stock control represents the clerical control of the movement of materials into and out of the stores, and of the level of the stock in the stores at all times with due regard to the economic in storage. 

10.  MATERIAL MANAGEMENT 

Material management is the act of planning, organization, controlling and directing of the supply and processing activities of materials in an organization. 

11. MATERIALS  HANDLING  

Materials handling is the overall means, method, approach and techniques used to effect the transfer and storage of terms. 

12.   RIGHT QUALITY  

Right quality means meeting an acceptable standard of performance by the material in order to meet the specification set out. 

13. RIGHT  QUANTITY   

Right quantity refers to the value or amount of material that can be most economically of supply with minimum investment in stock.  

14. RIGHT  PRICE  

Right price means buying at the best price that commensurate with quality and service required and the subsequent costs that may likely be incurred and above all, buying competitively and wisely. 

15. RIGHT TIME  

Right time means that supplies should be received not too early as to increase cost of stock holding neither unnecessarily nor too late as to cause avoidable delays and stoppages in production operation. 

16. RIGHT SOURCE 

Right source is the selection of the right source or supplier based on his willingness and the ability to fulfill the specified requirements of the purchase contract.  

.



TYPE IN YOUR TOPIC OR KEYWORD AND CLICK SEARCH:






HOW TO GET THE COMPLETE PROJECT MATERIAL ON THE IMPACT OF MATERIAL MANAGEMENT ON ORGANISATION PRODUCTIVITY (A Case Study of Nigerian Bottling Company Plc, Ilorin)

  • * Click the green DOWNLOAD button above

    * Select any option to get the complete project material instantly.

    * Chat our 24/7 customer service desk on WhatsApp# and get your complete project material instantly.

    * All project materials on this website are well researched by professionals with high level of professionalism.


TESTIMONIES FROM OUR CLIENTS

Please feel free to carefully review some written and captured responses from our satisfied clients.


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Exceptionally outstanding. Highly recommend for all who wish to have effective and excellent project defence. Easily Accessable, Affordable, Effective and effective."


  • Hilary Yusuf, United States International University Africa, Nairobi, Kenya.

    "I saw this website on facebook page and I did not even bother since I was in a hurry to complete my project. But I am totally amazed that when I visited the website and saw the topic I was looking for and I decided to give a try and now I have received it within an hour after ordering the material. Am grateful guys!"


  • Debby Henry George, Massachusetts Institute of Technology (MIT), Cambridge, USA.

    "Researchwap.net is a website I recommend to all student and researchers within and outside the country. The web owners are doing great job and I appreciate them for that. Once again, thank you very much "researchwap.net" and God bless you and your business! ."


  • Lamilare Valentine, Kwame Nkrumah University, Kumasi, Ghana.

    "Great User Experience, Nice flows and Superb functionalities.The app is indeed a great tech innovation for greasing the wheels of final year, research and other pedagogical related project works. A trial would definitely convince you."


  • Sampson, University of Nigeria, Nsukka.

    "I love what you guys are doing, your material guided me well through my research. Thank you for helping me achieve academic success."


  • Cynthia, Akwa Ibom State University .

    "researchwap.com is God-sent! I got good grades in my seminar and project with the help of your service, thank you soooooo much."


  • Elizabeth, Obafemi Awolowo University

    "Sorry, it was in my spam folder all along, I should have looked it up properly first. Please keep up the good work, your team is quite commited. Am grateful...I will certainly refer my friends too."


  • Ali Olanrewaju, Lagos State University.

    "Am happy the defense went well, thanks to your articles. I may not be able to express how grateful I am for all your assistance, but on my honour, I owe you guys a good number of referrals. Thank you once again."


  • Willie Ekereobong, University of Port Harcourt.

    "My Dear Researchwap, initially I never believed one can actually do honest business transactions with Nigerians online until i stumbled into your website. You have broken a new legacy of record as far as am concerned. Keep up the good work!"


  • Theressa, Igbinedion University.

    "WOW, SO IT'S TRUE??!! I can't believe I got this quality work for just 5k...I thought it was scam ooo. I wouldn't mind if it goes for over 5k, its worth it. Thank you!"


  • Joseph, Abia state Polytechnic.

    "I did not see my project topic on your website so I decided to call your customer care number, the attention I got was epic! I got help from the beginning to the end of my project in just 3 days, they even taught me how to defend my project and I got a 'B' at the end. Thank you so much researchwap.com, infact, I owe my graduating well today to you guys...."


  • Christiana, Landmark University .

    "My friend told me about ResearchWap website, I doubted her until I saw her receive her full project in less than 15 miniutes, I tried mine too and got it same, right now, am telling everyone in my school about researchwap.com, no one has to suffer any more writing their project. Thank you for making life easy for me and my fellow students... Keep up the good work"


  • Musa, Federal University of Technology Minna

    "I wish I knew you guys when I wrote my first degree project, it took so much time and effort then. Now, with just a click of a button, I got my complete project in less than 15 minutes. You guys are too amazing!."


  • Ali Obafemi, Ibrahim Badamasi Babangida University, Niger State.

    "I was scared at first when I saw your website but I decided to risk my last 5k and surprisingly I got my complete project in my email box instantly. This is so nice!!!."


  • To contribute to our success story, send us a feedback or please kindly call 2348037664978.
    Then your comment and contact will be published here also with your consent.
    Thank you for choosing researchwap.com.

FREQUENTLY ASKED QUESTIONS

  • How can I get the complete project on THE IMPACT OF MATERIAL MANAGEMENT ON ORGANISATION PRODUCTIVITY (A Case Study of Nigerian Bottling Company Plc, Ilorin)

    Simply click on the DOWNLOAD green button above and follow the procedure stated.


    Is it a complete project work or just materials?

    Yes, it's a Complete Research Project material. i.e Chapters 1-5, Abstract, Table of Contents, Full References, Questionnaires / Secondary Data


    What if I want to change the case study for THE IMPACT OF MATERIAL MANAGEMENT ON ORGANISATION PRODUCTIVITY (A Case Study of Nigerian Bottling Company Plc, Ilorin), What can i do?

    Chat with Our 24/7 Customer Service Desk Now: WhatsApp# and you will be responded to Instantly


    How long does it take to get the complete project on THE IMPACT OF MATERIAL MANAGEMENT ON ORGANISATION PRODUCTIVITY (A Case Study of Nigerian Bottling Company Plc, Ilorin)?

    Depending on how fast your payment and details is acknowledged by us, you will get the complete project within 30 minutes. However, on a very good day you can still get it within 15 minutes!


    How will I get my complete project?

    The Complete Project Material will be Delivered via your Email Address in an MS Word document format


    Can I get my Complete Project through WhatsApp?

    Yes! We also send your Complete Research Project to your WhatsApp Number


    What if my Project Supervisor made some changes to a topic i picked from your website?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    Do you assist students with Assignment, Term Paper, Seminar and Project Proposal?

    Call or Chat With Our 24/7 Custumer Care Desk: +2348037664978 and you will be responded to Instantly


    What if i do not have any project topic idea yet?

    Don't Worry! We've Got Your Covered. Chat with us on WhatsApp# to Get Instant Help.


    Why should I trust this website?

    We are well aware of fraudulent activities that have been happening on the internet. It is regrettable, but hopefully declining. However, we wish to reinstate to our esteemed clients that we are genuine and duly registered with the Corporate Affairs Commission as "TOPNOTCH INFOTECH ENTERPRISE". This site runs on Secure Sockets Layer (SSL), therefore all transactions on this site are HIGHLY secure and safe!


    I have a fresh topic that is not on your site. How do I go about it?

    Don't Worry, Chat with us on WhatsApp# (+234) 0803-766-4978 to Get Instant Help.